šŸŽ‰ Up to 70% Off Selected ItemsShop Sale
Product image 1
Product image 2
Product image 3
Product image 4
Product image 5
Product image 6
Product image 7
Product image 8
HomeStore

LNER West Riding Limited Double Open First Articulated Coach Pack

LNER West Riding Limited Double Open First Articulated Coach Pack

Following the success of the LNER’s newly-introduced ā€˜Coronation’ trains in 1935, a new train was introduced to operate between London King’s Cross and Leeds and Bradford in 1937.

A new set of carriages was built that was identical to the ā€˜Coronation’ with four twin articulated coaches, though not the streamlined beavertail observation car, named the ā€˜West Riding Limited’. Carriages were in pairs, sharing a bogie between the two, thus reducing friction and improving ride quality.

The train first ran on 27th September 1937 and achieved an average speed of 63.3mph (101.9km/h) between King’s Cross and Bradford. It was hauled by Gresley ā€˜A4’ No. 4492 ā€˜Dominion of New Zealand’, which had emerged from Doncaster Works only three months earlier.

Services were suspended for the duration of the Second World War, but were reinstated in 1949. A modern version of the train is still operated by the present-day LNER with a 6.30am departure from Bradford Forster Square station.

The next vehicles in the rake are coaches ā€˜C’ and ā€˜D’ and these comprise of two identical first class open coaches which offered enhanced comfort and also had a lavatory at each end. These coaches are the ones presented in this highly detail OO gauge coach pack.

What's Inside

  • 2x Model Passenger Coach
  • 1x Accessory Pack
$181.38
LNER West Riding Limited Double Open First Articulated Coach Pack—
$181.38

Product Information

Shipping & Returns

Description

Following the success of the LNER’s newly-introduced ā€˜Coronation’ trains in 1935, a new train was introduced to operate between London King’s Cross and Leeds and Bradford in 1937.

A new set of carriages was built that was identical to the ā€˜Coronation’ with four twin articulated coaches, though not the streamlined beavertail observation car, named the ā€˜West Riding Limited’. Carriages were in pairs, sharing a bogie between the two, thus reducing friction and improving ride quality.

The train first ran on 27th September 1937 and achieved an average speed of 63.3mph (101.9km/h) between King’s Cross and Bradford. It was hauled by Gresley ā€˜A4’ No. 4492 ā€˜Dominion of New Zealand’, which had emerged from Doncaster Works only three months earlier.

Services were suspended for the duration of the Second World War, but were reinstated in 1949. A modern version of the train is still operated by the present-day LNER with a 6.30am departure from Bradford Forster Square station.

The next vehicles in the rake are coaches ā€˜C’ and ā€˜D’ and these comprise of two identical first class open coaches which offered enhanced comfort and also had a lavatory at each end. These coaches are the ones presented in this highly detail OO gauge coach pack.

What's Inside

  • 2x Model Passenger Coach
  • 1x Accessory Pack
LNER West Riding Limited Double Open First Articulated Coach Pack | Rails